Objective Projects

Several projects have been chosen for each of the work packages 2, 3, 4 and 5 which are shown below

Objective Projects – Work Package 2

During the year 2018, an amount of € 691,529.81 was granted as aid to local entities for the promotion of energy efficiency, the implementation of renewable energies and the promotion of electric mobility. In addition, the non-profit entities received subsidies for the promotion of energy efficiency, renewable energy and sustainable mobility and shared for € 297,268.00.

Below are features and photographs of some of the measures already implemented.

WP2 – Renovation of public lighting in Noain

Characteristics:

– Color temperatura: 3000 K // SHF < 1

– Total power: 9,534 kW

– Average annual consumption per year before implementation: 65429 kWh

– Estimated annual consumption per year after implementation: 23895 kWh

– Estimated annual savings per year: 41534 kWh (63 %)

WP2 – Expansion of the Installation of photovoltaic panels in Valley of Aranguren

Characteristics:

– Expansion of the current photovoltaic installation: 55 kW

Nominal power of the extended installation: 100 kW

– Type of photovoltaic panel: model Amerisolar – AS-6P30-280

– Self-consumption management and zero injection system

– Divulgative panel

WP2 – Electric Vehicle Purchase – Valley of Aranguren

Characteristics:

– Category N1 of electric vehicle

– Number of electric vehicles purchased: 2

WP2 – Electric Vehicle Recharging Point – Valley of Aranguren

Characteristics:

– Recharge mode type 3 according to CTI-LV 52

– Electric recharge monitoring software

– Recharge through Schuko or type 2 connector

– Fixed to ground

– Number of recharging points installed: 1

WP2 – Electric urban transport – Pamplona

Characteristics:

– Number of pantograph posts at the head of the line: 2

– Number of electric vehicles: 6

Subsidy: € 200,000 for the recharging infrastructure (estimated cost of € 650,000)

Objective Projects – Work Package 3

Four buildings from diverse municipalities has been chosen as objective projects to implement energy retrofitting investments in the work package 3.

Below are some information regarding the objective projects.

Objective Projects – Work Package 4

Five buildings from diverse municipalities has been chosen as objective projects to implement energy retrofitting investments in the first phase of the work package 4.

Below are some information regarding the objective projects.

Objective Projects – Work Package 5

Technical assistance is being provided to several companies in different projects for the implementation of energy efficiency measures.

Below are information regarding the two first projects.

WP5 – Replacement of compressors of the current compressed air installation by compressor with variable speed drive

Characteristics:

– Investments: € 185,169

– Estimated annual savings: 20%

WP5 – Replacing the current machine cooling installation using towers with high efficiency air condensed water chillers

Characteristics:

– Investments: € 330,000

– Estimated annual savings: 21%

WP5 – Replacing the current steam boilers with a steam boiler with incorporation of more efficient systems in the agri-food industry

Characteristics:

– Investments: € 350,000

– Estimated annual savings: 4%

WP5 – Replacing a batch digester with a continuous one in the agri-food industry

Characteristics:

– Investments: € 652,000

– Estimated annual savings: 13 %